Difference between revisions of "User:George"

From VOC Wiki
Jump to: navigation, search
(2016-10-01 Lizzie)
Line 8: Line 8:
  
 
===2016-10-01 Lizzie===
 
===2016-10-01 Lizzie===
 
+
*need to do Floor Measurements
 +
*Upstairs Railing (measurements) may have necessary material at the Hut. Need to do inventory.
 +
*New stove hauled up. Need to haul old stove down. Leave gas for lanterns.
 +
*Running low on wood for the hut. Could use chainsaws on trail portion from end of logging road to barr creek bridge.
 +
*Use chainsaws up at hut to cut more wood. -> is this necessary? Could an axe do the work? Do we have an axe at the hut?
 +
*Nice guitar and case up to the hut with the helicopter? Need case to protect from moisture.
 +
*Plywood in old outhouse.
 +
*Have two bow-saws at hut.
 +
*There will be standard door frames. Non-standard door frames will be expensive. Want 1/2" to 1/4" door frame for steel door.
 +
*Want door to extend right to wall. Need to put aluminum to fit to door.
 +
*2x3 wood
 +
*aluminim paneling on outside of hut
 +
*Chicken wire and rip-rap around seems to be working against the marmots.
 +
*Would be nice to have signage along logging road for directions to hut and to the springs
 +
*signage for the springs is more important because of the turn off on the logging road.
 +
*some sections of the trail could use brushing. Mostly the first 6km. 2nd part is in good condition with exception of the fallen logs.
 +
*would be nice to have poker chips & a nice set of cards @ the hut. Maybe a rumoli matt
 +
*bridge right next to hut seems unnecessary for all seasons (may not spring? idk, need to see pictures)
 +
*hay wire and duct tape for all huts
 +
*for harrison put floor ontop of old floor. 2' x 4' x 4' x 2' to overlap cracks
 +
*will want to rip in vancouver
 +
*make sure door is hollow. & talk to someone about fit.
  
 
==File Manager==
 
==File Manager==

Revision as of 21:45, 10 October 2016

George Hill is the current 2016-2017 Huts Coordinator for the VOC. To get in touch please leave a message on the discussion page or send an email to [email protected]


Workhikes

2016-07-01 Phelix

2016-09-03 Harrison

2016-10-01 Lizzie

  • need to do Floor Measurements
  • Upstairs Railing (measurements) may have necessary material at the Hut. Need to do inventory.
  • New stove hauled up. Need to haul old stove down. Leave gas for lanterns.
  • Running low on wood for the hut. Could use chainsaws on trail portion from end of logging road to barr creek bridge.
  • Use chainsaws up at hut to cut more wood. -> is this necessary? Could an axe do the work? Do we have an axe at the hut?
  • Nice guitar and case up to the hut with the helicopter? Need case to protect from moisture.
  • Plywood in old outhouse.
  • Have two bow-saws at hut.
  • There will be standard door frames. Non-standard door frames will be expensive. Want 1/2" to 1/4" door frame for steel door.
  • Want door to extend right to wall. Need to put aluminum to fit to door.
  • 2x3 wood
  • aluminim paneling on outside of hut
  • Chicken wire and rip-rap around seems to be working against the marmots.
  • Would be nice to have signage along logging road for directions to hut and to the springs
  • signage for the springs is more important because of the turn off on the logging road.
  • some sections of the trail could use brushing. Mostly the first 6km. 2nd part is in good condition with exception of the fallen logs.
  • would be nice to have poker chips & a nice set of cards @ the hut. Maybe a rumoli matt
  • bridge right next to hut seems unnecessary for all seasons (may not spring? idk, need to see pictures)
  • hay wire and duct tape for all huts
  • for harrison put floor ontop of old floor. 2' x 4' x 4' x 2' to overlap cracks
  • will want to rip in vancouver
  • make sure door is hollow. & talk to someone about fit.

File Manager

Documents

Hut Issues

Trail Issues

GPX Tracks

Brew

Lizzie

Images

Lizzie Creek Cabin

Inventory October 1st 2016

Stock Photos Tool Inventory