Special Projects Coordinator: Jeff Ferguson

Overview

Minor repairs were completed this winter. Most large projects need to be done during the summer months.

Routine Maintenance

Brew

  • Replaced broken window latch
  • New hole for outhouse needed in near future?


Phelix

  • A group made repairs to the roof in October.
  • Assessed mildew. Took measurements for exposed wood surface area in order to calculate how much paint is needed. Interior painting to be done in summer 2009.
  • Measurements taken and details recorded on the solar panel. Roland plans to do something with this. Batteries are dead beyond repair.

Harrison

  • discussion about replacing/renovating the outhouse. Nothing confirmed.
  • Trail design and location in progress. Pete Hudson in charge.